East London NHS Foundation Trust
ELFT Alie Street Lifts Refurbishment
he scope of this contract shall, where applicable, include the complete and all design for the installation.
The design, supply and installation of the new lift components detailed in this specification.
The design shall include, design drawings, contract drawings and record drawings, and all other information required by members of the professional team to allow proper integration of the installations within the building, including the provision of information and comments for the scheme design, required by building control.
All labour, materials, tools and equipment required for the supply of and installation of the new lift installation detailed in this specification and for the testing, commissioning and setting to work of the installation together with the production of record drawings and operating and maintenance manuals.
Liaison with the Employer, their representatives, the engineering services lead co-ordinator and all other contractors as necessary, to allow proper integration of the installations within the building.
The work will comprise of; The modernisation 2 x Passenger Lifts and 1 x Passenger / Goods Lift.
The works required are detailed in Section 3 of this specification.
The building, lifts wells and machine room are existing.
The modernised lifts shall be in compliance with; EN81-20/50, EN81-70, EN81-73, EN81-28 as far as reasonably practicable.
Tenders shall not be accepted without prior site surveys by the tendering contractor.
The lift works shall be consecutive, undertaken in the following order; Left Hand Passenger Lift Right Hand Passenger Lift Passenger / Goods TBC The main passenger lifts are currently fire recall, an exercise to utilise these as part of the evacuation strategy is being considered.
Therefore, a cost option to incorporate evacuation functions and UPS secondary power is to be costed as a line item.
What the supplier must deliver
He scope of this contract shall, where
he scope of this contract shall, where applicable, include the complete and all design for the installation.
The design, supply and installation of
The design, supply and installation of the new lift components detailed in this specification.
All labour, materials, tools and equipment required
All labour, materials, tools and equipment required for the supply of and installation of the new lift installation detailed in this specification and for the testing, commissioning and setting to work of the installation together with the production of record drawings and operating and maintenance manuals.
Liaison with the Employer, their representatives,
Liaison with the Employer, their representatives, the engineering services lead co-ordinator and all other contractors as necessary, to allow proper integration of the installations within the building.
The modernised lifts shall be in compliance
The modernised lifts shall be in compliance with; EN81-20/50, EN81-70, EN81-73, EN81-28 as far as reasonably practicable.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at East London NHS Foundation Trust, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- ocds-h6vhtk-059bc3
- Stage
- award · Awarded
- Source
- Find a Tender
- Buyer ref
- 057121-2025
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
East London NHS Foundation Trust’s tender network
Assembling the network…