RFP QuestBeta
OpenStage · planning

Forestry Commission

Design and Supply of Fibre Reinforced Polymer (FRP) Bridges and Decking Systems

ConstructionCPV 45221100
ValueValue not published
Deadline
Published30 Sept 2025
RegionNationwide
Who to contact
commercial.services@forestryengland.uk

The procurement contact named on the official notice.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

Design and supply of Fibre Reinforced Polymer (FRP) Bridges - Roadbridges suitable for 44Tonnes Highways Loading plus supply and design of footbridges, cycleways, bridleways and bridge decking solutions suitable for highways loading (up to 44 Tonnes).

The manufacturing process should use the resin infusion technique with a mould.

This allows arrangement of fibres at different orientations to ensure maximum performance and if required fibre and resin types can be altered to suit a particular application.

Foam core should also be used between the top mat and bottom mat for structural efficiency.

Ideally constructed using a proven monolithic FRP system (e.g.

InfraCore or equivalent) with vacuum infusion method.

This type of construction has a low maintenance requirement and subsequently features a long design life.

Elements of the bridge structures will have an expected design life of: - Deck - 100+ years - Surfacing 10+ years - Parapets 30+ years - UV protection 60+ years Also be able to design such bridges and provide outline proposals and detailed costings.

Most structures we require will need bespoke designs.

Typical projects expected to range between £50k–£250k per bridge, depending on size and specification Be able to manufacture and supply a bridge within a short timeframe up to 3 months.

Key requirements

What the supplier must deliver

01

Design and supply of Fibre Reinforced Polymer

Design and supply of Fibre Reinforced Polymer (FRP) Bridges.

02

Roadbridges suitable for 44Tonnes Highways Loading plus

Roadbridges suitable for 44Tonnes Highways Loading plus supply and design of footbridges, cycleways, bridleways and bridge decking solutions suitable for highways loading (up to 44 Tonnes).

03

The manufacturing process should use the resin

The manufacturing process should use the resin infusion technique with a mould.

04

This allows arrangement of fibres at different

This allows arrangement of fibres at different orientations to ensure maximum performance and if required fibre and resin types can be altered to suit a particular application.

05

Foam core should also be used between

Foam core should also be used between the top mat and bottom mat for structural efficiency.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Forestry Commission, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
ocds-h6vhtk-05a4cb
Stage
planning · Planning
Source
Find a Tender
Buyer ref
060843-2025
View the original notice on Find a Tender

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

Forestry Commission’s tender network

Assembling the network…

Also open now

Similar open tenders

Design, Supply & Installation of Three Inclusive Play Area Replacements with Community Engagement – Wheatpieces, Tewkesbury

Tewkesbury Borough Council

Closes 24 Aug 2026Construction
£200kValue

UWTSD2526/243. Design, Supply & Install Air Source Heat Pumps

University of Wales Trinity Saint David

Closes 7 Aug 2026Construction
£900kValue