North East London NHS Foundation Trust
Toilets
The procurement contact named on the official notice.
The works include the full strip-out, refurbishment, and reinstallation of sanitary fittings, finishes, and associated building and plumbing works to the existing toilet area.
1.
Strip Out and Preparation a.
Strip out and remove existing toilet, sink, and associated fittings. b.
Carry out full demolition/soft strip of redundant fixtures, finishes, and pipework as required. c.
Remove existing internal door and door furniture. d.
Dispose of all waste materials in accordance with site waste management and environmental regulations. e.
Make good all disturbed areas to a sound and even finish ready for decoration.
2.
Windows a.
Make good 2 no. existing windows, including repair of frames, cleaning, sealing, and preparation for decoration as required.
3.
Decoration a.
Prepare all wall, ceiling, and wood surfaces. b.
Apply one mist coat and one full coat of quality trade emulsion to walls and ceilings. c.
Apply suitable finish paint to all woodwork, trims, and window frames.
4.
Joinery Works a.
Refurbish existing door, including sanding, filling, repainting/staining, and fitting new door furniture (handle, lock, and signage). b.
Install shelving to support new water heater - securely fixed, level, and able to support full load of the appliance. c.
Construct and install heater cover (removable for access and maintenance), finished to match surrounding décor. d.
Carry out any required boxing-in of pipework to provide a neat and accessible finish.
5.
Plumbing Works a.
Supply and install new close-coupled WC suite, including pan, cistern, seat, and all fixings. b.
Supply and install new sink with thermostatic mixing tap. c.
Supply and install new 15-litre electric water heater. d.
Complete all associated pipework, waste, and lagging to meet current Building and Water Regulations. e.
Pressure test system upon completion.
6.
Mechanical Works a.
Core hole through external wall for new extract fan installation (fan to be supplied separately or as specified). b.
Seal all penetrations weather-tight and make good finishes.
7.
Completion a.
Ensure all works are clean, fully operational, and tested. b.
Remove all rubbish and debris from site. c.
Provide user instructions for all new equipment (heater, tap, etc.). d.
Leave area ready for immediate use
What the supplier must deliver
Install shelving to support new water heater
Install shelving to support new water heater.
Securely fixed, level, and able to support
securely fixed, level, and able to support full load of the appliance.
Carry out any required boxing-in of pipework
Carry out any required boxing-in of pipework to provide a neat and accessible finish.
Supply and install new close-coupled WC suite
Supply and install new close-coupled WC suite, including pan, cistern, seat, and all fixings.
Supply and install new sink with thermostatic
Supply and install new sink with thermostatic mixing tap.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at North East London NHS Foundation Trust, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- ocds-h6vhtk-05e214
- Stage
- award · Awarded
- Source
- Find a Tender
- Buyer ref
- 074228-2025
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
North East London NHS Foundation Trust’s tender network
Assembling the network…