ASTER GROUP LIMITED

MAIN BLOCK 4-7 Hawkins Road - 2025-2026 Planned roof programme - Pitched Roof

ValueValue not published
Deadline
Published29 Jan 2026
RegionNationwide
Who to contact
aster.procurement@aster.co.uk

The procurement contact named on the official notice.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

Project: The refurbishment of the main hipped roof NB: All roofing work to be carried out by an NFRC accredited contractor & must be able to self-certify via the competent roofing scheme.

As part of contractor pre-survey, contractor should identity any soffit and live extractor fan vents which will need to be disconnected and reconnected during works All flats must be checked to see if there are any live gas appliances, wood burning/multi fuel stoves or open fires still in use prior to the removal of any chimney stacks.

Evidence shall be provided to the Aster Surveyor who will be able to authorise this phase of work if necessary.

Isolation of flues (priced separately) in line with gas protocols, removals (priced separately) to be discussed and review with client.

Aster Surveyor to advise with any blocking up and venting work as the scope of work will need to be agreed with the leaseholder/s or resident/s in advance.

Erect tubular steel scaffolding with required lifts to such elevations, including suitable access for removing the shared chimney and dismantle on completion.

All scaffolding to be measured against the face of the building and to include the lift heights for a specific work type and trade.

Allow for repositioning of existing satellite dishes & T.V. aerials, including re-instating them and testing the signal both inside and outside of a property.

NB: The existing T.V. aerials if live will need to be reinstated inside the loft space Remove existing tiles, battens, felt, safely lower to ground level and remove from site.

Allow for clearing all debris from the eaves and behind the skeiling/sloping ceiling detail, then insulate using a 50-75mm thick PIR insulation board with a foil backing ensuring that an adequate air gap's left for ventilation.

Allow for the supply and install new structural timber to rafters and ridge sections including noggins to fill in any collapsed verge ladder or rotten rafter (Provisional sum included in pricing document but only to be spent with the agreement of Aster surveyor) The contractor must allow for accessing the loft spaces in top floor flats to see if the gable ends have been strapped to provide lateral stability.

Allow for supplying and installing Simpson Strong-Tie retrofit restraint straps. (To be installed as per the manufacturers instructions).

Supply and fix new Permavent Apex breathable membrane to the entire roof area and fix new 38 x 25 mm treated and Bs coded timber battens to rafters.

Supply and install new Redland Duoplain Concrete Interlocking roof tiles including new dry fixed Redland Universal Angle Ridge.

Colour to match existing, to be agreed with the contract surveyor prior to ordering.

All materials to be installed as per manufacturer’s instructions.

Supply and fix eaves support trays G1281 by Manthorpe, including rafter roll fitted as per manufacturer’s instructions.

To all roofs in contract.

Check the condition of the existing aluminium Ogee guttering and if serviceable clean and check the existing fixtures and fittings are secure and that it doesn’t leak. (The RWGs can remain insitu if found to be in good working order).

Allow for supplying and fitting new deep flow guttering including downpipes, connections and associated fixtures & fittings to flat block.

Test guttering for leaks and adequate falls.

Deliver free of dirt or imperfections.

All waste material and debris will be removed from site.

The contractor is to leave the properties and surrounding areas etc clean and clear to original condition.

Wash down windows, doors, and existing/new PVCu Fascia's/soffits on completion to remove dirt & debris caused by roofing works.

Key requirements

What the supplier must deliver

01

NB: All roofing work to be carried

NB: All roofing work to be carried out by an NFRC accredited contractor & must be able to self-certify via the competent roofing scheme.

02

As part of contractor pre-survey, contractor should

As part of contractor pre-survey, contractor should identity any soffit and live extractor fan vents which will need to be disconnected and reconnected during works.

03

All flats must be checked to see

All flats must be checked to see if there are any live gas appliances, wood burning/multi fuel stoves or open fires still in use prior to the removal of any chimney stacks.

04

Evidence shall be provided to the Aster

Evidence shall be provided to the Aster Surveyor who will be able to authorise this phase of work if necessary.

05

Aster Surveyor to advise with any blocking

Aster Surveyor to advise with any blocking up and venting work as the scope of work will need to be agreed with the leaseholder/s or resident/s in advance.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at ASTER GROUP LIMITED, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
ocds-h6vhtk-0611ea
Stage
award · Awarded
Source
Find a Tender
Buyer ref
007996-2026
View the original notice on Find a Tender

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

ASTER GROUP LIMITED’s tender network

Assembling the network…