UNITED KINGDOM NATIONAL NUCLEAR LABORATORY LIMITED
Construction and commission of modular rig
The procurement contact named on the official notice.
UKNNL is seeking expressions of interest from suitably qualified and experienced contractors to support the assembly, installation verification, and inactive commissioning of a new modular experimental rig at the Preston facility.
The rig comprises a modular, three-storey structure incorporating multiple process and utility services.
The appointed contractor will be responsible for mechanical assembly, installation checks, and inactive commissioning (without uranics) to enable active commissioning (with uranics) by others.
2.
Scope of Work The contractor will be expected to undertake, as a minimum: Mechanical Assembly • Offloading, positioning, and installation of prefabricated rig modules • Mechanical assembly and integration of modules to form the complete structure • Installation of access platforms, supports, and ancillary equipment • Alignment, fixing, and structural integrity checks Interface & Service Readiness • Preparation and verification of interfaces for: o Gas services o Extraction/ventilation o Fluids o Electrical supplies • Coordination with service installation contractors • Ensuring connection points are accessible, correctly labelled, and compliant with drawings/specifications Electrical, Controls and Instrumentation: • Cross module connections • Final install • Connection to Pilot Plant electrical distribution network 1.
Project Overview UKNNL is seeking expressions of interest from suitably qualified and experienced contractors to support the assembly, installation verification, and inactive commissioning of a new modular experimental rig at the Preston facility.
The rig comprises a modular, three-storey structure incorporating multiple process and utility services.
The appointed contractor will be responsible for mechanical assembly, installation checks, and inactive commissioning (without uranics) to enable active commissioning (with uranics) by others. ________________________________________ 2.
Scope of Work The contractor will be expected to undertake, as a minimum: Mechanical Assembly • Offloading, positioning, and installation of prefabricated rig modules • Mechanical assembly and integration of modules to form the complete structure • Installation of access platforms, supports, and ancillary equipment • Alignment, fixing, and structural integrity checks Interface & Service Readiness • Preparation and verification of interfaces for: o Gas services o Extraction/ventilation o Fluids o Electrical supplies • Coordination with service installation contractors • Ensuring connection points are accessible, correctly labelled, and compliant with drawings/specifications Electrical, Controls and Instrumentation: • Cross module connections • Final install • Connection to Pilot Plant electrical distribution network Installation Verification • Completion of installation checks against drawings and specifications • QA/QC inspections and documentation • Identification and resolution of defects or non-conformances • As-built documentation and redlining Inactive Commissioning • Mechanical completion checks • Pressure/leak testing (where applicable) • Functional checks (non-energised / non-process) • Safety and compliance verification • Handover documentation and commissioning packs ________________________________________ 3.
Contractor Requirements Interested parties should demonstrate: • Experience assembling modular or multi-storey industrial/process rigs or plant • Experience working with multi-disciplinary service interfaces (gas, fluids, extraction, electrical) • Commissioning and mechanical completion experience • Strong health, safety, and quality management systems to comply with CDM regulations • Ability to work within an operational facility environment • Relevant certifications and competencies ________________________________________ 4.
Deliverables The appointed contractor will be expected to provide: • Method statements and risk assessments • Installation and commissioning plans • Inspection and test records • Mechanical completion dossiers • As-built documentation • Handover pack ________________________________________ 5.
Programme (Indicative) • Site readiness: June 2026 • Assembly period: 3 months • Handover to active commissioning: September 2026
What the supplier must deliver
UKNNL is seeking expressions of interest from
UKNNL is seeking expressions of interest from suitably qualified and experienced contractors to support the assembly, installation verification, and inactive commissioning of a new modular experimental rig at the Preston facility.
The appointed contractor will be responsible
The appointed contractor will be responsible for mechanical assembly, installation checks, and inactive commissioning (without uranics) to enable active commissioning (with uranics) by others.
The contractor will be expected to undertake
The contractor will be expected to undertake, as a minimum:.
Mechanical assembly and integration of modules
Mechanical assembly and integration of modules to form the complete structure.
Interested parties should demonstrate
Interested parties should demonstrate:.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at UNITED KINGDOM NATIONAL NUCLEAR LABORATORY LIMITED, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- ocds-h6vhtk-064afb
- Stage
- planning · Planning
- Source
- Find a Tender
- Buyer ref
- 011320-2026
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Assembling the market network…
UNITED KINGDOM NATIONAL NUCLEAR LABORATORY LIMITED’s tender network
Assembling the network…