Pump Track
The procurement contact named on the official notice.
Project Aim To design and construct a durable, community-focused pump track suitable for a wide range of users and abilities.
Scope of Works The appointed contractor will be responsible for the full design and installation of the pump track, including but not limited to: • Site assessment and feasibility considerations. • Concept design and detailed technical design. • Ground preparation, earthworks, drainage, and surfacing. • Supply of all materials, plant, and labour. • Project management and programme coordination. • Health and safety compliance (including CDM regulations where applicable). • Construction and installation works. • Quality assurance, testing, and certification. • Site reinstatement and finishing works. • Handover documentation including maintenance guidance.
Contractors must ensure designs reflect best practice in pump track construction, durability, safety, accessibility, and long-term maintenance efficiency.
Recommended Design Contractors are encouraged to include a recommended design they believe best meets the project objectives and represents optimal value.
Design Submission Content Design proposals should include: • Concept visuals, layouts, and drawings. • Description of features and riding flow. • Intended user groups and skill progression. • Accessibility and inclusive design considerations. • Materials and surfacing specification (e.g. asphalt, concrete, modular systems). • Drainage approach. • Safety design considerations and risk mitigation. • Maintenance requirements and lifecycle expectations.
Pricing Requirements Submissions must include: • Full cost breakdown for design and installation for each price point. • Identification of optional extras and exclusions. • Design fees clearly separated where applicable. • Estimated maintenance costs (if available). • Confirmation that prices remain valid for a minimum of 12 months from submission date to allow for funding decisions.
What the supplier must deliver
The appointed contractor will be responsible
The appointed contractor will be responsible for the full design and installation of the pump track, including but not limited to:.
Supply of all materials, plant, and labour
Supply of all materials, plant, and labour.
Contractors must ensure designs reflect best practice
Contractors must ensure designs reflect best practice in pump track construction, durability, safety, accessibility, and long-term maintenance efficiency.
Design proposals should include
Design proposals should include:.
Submissions must include
Submissions must include:.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Lowestoft Town Council, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- ocds-h6vhtk-0661f1
- Stage
- tender · Open
- Source
- Find a Tender
- Buyer ref
- 027460-2026
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Assembling the market network…
Lowestoft Town Council’s tender network
Assembling the network…