The Police and Crime Commissioner for Humberside
Electrical Infrastructure Upgrade to Support SALIX Works
The procurement contact named on the official notice.
The SALIX 3C works involve the removal of the existing gas boilers within the boiler house and the supply, installation, and commissioning of two new electric boilers, each rated at 252kW.
The site's existing electrical capacity is insufficient to support these works.
An upgrade to the electrical infrastructure is therefore required to meet the additional demand and maintain headroom.
The electrical upgrade includes the following: The current on-site transformer is rated at 0.8MVA.
It is proposed that this be replaced with a new 1.5MVA transformer to support the increased demand.
Transformer to include a feeder pillar for distribution of new LV supplies and to meet DNO requirements.
This upgrade will maintain the existing headroom to contribute towards future EV charging (requirements not known at this time).
Works are to include for the excavation, laying of ducts, cables, backfilling, and reinstatement of the cable route between the transformer and the plant room.
New cable containment will be required at both ends of the proposed duct route.
All works are to be completed in accordance with relevant standards, regulations, and site.
Requirements, including Testing of the HV and LV electrical installation and co-ordination of works with Humberside Police Joint Estate Service Engineers and the DNO.
What the supplier must deliver
The SALIX 3C works involve the removal
The SALIX 3C works involve the removal of the existing gas boilers within the boiler house and the supply, installation, and commissioning of two new electric boilers, each rated at 252kW.
The site's existing electrical capacity is insufficient
The site's existing electrical capacity is insufficient to support these works.
An upgrade to the electrical infrastructure is
An upgrade to the electrical infrastructure is therefore required to meet the additional demand and maintain headroom.
It is proposed that this be replaced
It is proposed that this be replaced with a new 1.5MVA transformer to support the increased demand.
This upgrade will maintain the existing headroom
This upgrade will maintain the existing headroom to contribute towards future EV charging (requirements not known at this time).
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at The Police and Crime Commissioner for Humberside, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- ocds-h6vhtk-066f62
- Stage
- award · Awarded
- Source
- Find a Tender
- Buyer ref
- 025355-2026
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
The Police and Crime Commissioner for Humberside’s tender network
Assembling the network…