Rail Safety Standards Board (RSSB)
Market Engagement Questionnaire for T1418 How can batteries make the DC network safer and more cost effective?
The procurement contact named on the official notice.
This is a large award for Research & Development — above three-quarters of comparable contracts. Based on 20,405 valued Research & Development tenders in our corpus.
DC electrification is a system used to provide electric traction power to trains via an exposed conductor rail, commonly described as the ‘3rd rail’.
The 3rd rail system is predominantly used in the south of England but is also used by the Merseyside commuter rail network in the North-West.
Because of its accessible position on the ground next to the running rails, 3rd rail systems pose an electrical safety risk to the public and railway staff.
To address these concerns in a cost-effective way, small retrofittable batteries could be used to allow trains to run between modest gaps in 3rd rail.
This would allow removal of live 3rd rail at higher risk location such as stations, level crossing, and junctions.
Elimination of certain sections of the DC network, such as at switch and crossing junctions, could also result in maintenance productivity gains.
RSSB project T1272 ‘Compatibility and optimisation considerations for rolling stock traction batteries and battery charging’ (T1272 Phase 1b Report FINAL – Page 64) indicated that a modest sized battery of 100 kWh could potentially remove larger parts of the DC network and allow a train to move through up to two kilometres of traction power disruptions.
The introduction of batteries for these aims must consider capital and operational costs, the engineering and operational controls that would be needed, and the transition strategy for both rolling stock and infrastructure.
For more information about this opportunity, please visit the eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-London:-Research-services./F3ZBDSMB6C To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/F3ZBDSMB6C
What the supplier must deliver
DC electrification is a system used
DC electrification is a system used to provide electric traction power to trains via an exposed conductor rail, commonly described as the ‘3rd rail’.
The introduction of batteries for these aims
The introduction of batteries for these aims must consider capital and operational costs, the engineering and operational controls that would be needed, and the transition strategy for both rolling stock and infrastructure.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Rail Safety Standards Board (RSSB), and generate a go-to-market strategy from their news, accounts and people.
- OCID
- ocds-h6vhtk-06b002
- Stage
- planning · Planning
- Source
- Find a Tender
- Buyer ref
- 053890-2026
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Research & Development
Assembling the market network…
Rail Safety Standards Board (RSSB)’s tender network
Assembling the network…
Similar open tenders
1049366347 T1418 Opportunities for battery-powered trains to improve the safety and efficiency of the 3rd rail DC network
RSSB
Developing a data-led, integrated digital platform to support strategic decision-making across the UK zero-emission aviation ecosystem
CONNECTED PLACES CATAPULT