Northern Lighthouse Board HQ Roof Works
The procurement contact named on the official notice.
This sits in the upper-middle of the Construction band — a substantial contract for the sector. Based on 64,002 valued Construction tenders in our corpus.
This project primarily involves the replacement the existing roof slates, underslating felt, zinc and lead flashings, dormer leadwork, repairs to timber facias and sills to one of the dormer windows, and painting of all the timber framed windows.
The existing roof coverings are estimated to be ~60 years old and in need of replacement to ensure the building is kept watertight, avoiding potential for expensive and inconvenient repairs for water ingress damage.
As 84 George Street is a Grade A listed building, the Northern Lighthouse Board have an obligation to maintain the appearance of the roof and retain the original character of the building.
As a matter of high priority, safety of the public and NLB staff must be maintained at all times by ensuring there is no risk from falling slates.
The main items of project work are as listed below:- 1.Scaffolding to be designed by Temporary Works Designer.
2.Seek all necessary permits for scaffolding and works.
3.Erect scaffolding to front and rear elevations of building.
4.Carryout asbestos survey.
5.Remove existing lead and zinc flashings and lead from dormers.
Remove existing slate and stack carefully in palletised crates for removal offsite.
Remove all the existing underslating felt.
6.Replace any rotten sarking boards as necessary.
7.Carryout repairs to chimney pots and chimney breast.
Anticipated Start Date September 2026 8.Install new breather membrane, lead flashings, lead to dormers, slates, and zinc flashings.
9.Carryout inspection of rainwater goods and repair as required.
10.Inspect pointing around timber framed windows and carryout repairs with burnt sand mastic as necessary.
11.Prepare timber framed windows and apply paint coating system.
12.Dis-assemble scaffolding and remove from site.
13.De-mobilise site and clear all surplus project materials and plant, with the disposal of excess project materials to appropriate licensed and registered dumps.
14.The Principal Contractor is to supply the NLB Project Engineer with ‘as-built’ information for incorporation within NLB Operational and Maintenance documentation, which includes the Health and Safety file in line with current CDM Regulations.
What the supplier must deliver
The existing roof coverings are estimated
The existing roof coverings are estimated to be ~60 years old and in need of replacement to ensure the building is kept watertight, avoiding potential for expensive and inconvenient repairs for water ingress damage.
As 84 George Street is a Grade
As 84 George Street is a Grade A listed building, the Northern Lighthouse Board have an obligation to maintain the appearance of the roof and retain the original character of the building.
As a matter of high priority, safety
As a matter of high priority, safety of the public and NLB staff must be maintained at all times by ensuring there is no risk from falling slates.
14.The Principal Contractor is to supply
14.The Principal Contractor is to supply the NLB Project Engineer with ‘as-built’ information for incorporation within NLB Operational and Maintenance documentation, which includes the Health and Safety file in line with current CDM Regulations.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Northern Lighthouse Board, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- ocds-h6vhtk-06bea4
- Stage
- planning · Planning
- Source
- Find a Tender
- Buyer ref
- 060535-2026
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Assembling the market network…
Northern Lighthouse Board’s tender network
Assembling the network…