Cornwall Council

Tamar Bridge Kerb Unit and Deck Waterproofing Remedial Work

ConstructionCPV 45232451
Value£3.0m
Awarded17 Dec 2018
Published4 Mar 2019
RegionSouth West
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£3.0mtotal contract value
median £158k
this tender£0£6.5m

This is a large award for Construction — above three-quarters of comparable contracts. Based on 64,002 valued Construction tenders in our corpus.

The brief

With the aim being to undertake work during the Spring of 2019, this preferred start date is intended to allow for all kerb fixings and corrosion remedial works to be completed ahead of separate resurfacing work planned for 2020/21.

Following close monitoring of the existing 7200 Kerb Units ( 4 studs per kerb unit) and the associated Deck Waterproofing System over recent years, since their initial installation, as part of the strengthening and widening scheme around the turn of the century, and following the identification of serious deterioration, a number of technical solutions were developed and tested and the preferred solution and range of activities required going forward is described as follows: Remove and retain existing kerb units for re-use; Remove existing mild steel holding down studs, clean and shot blast bridge deck to remove corrosion; Undertake Plate testing (MPI) and, if necessary, undertake Weld repairs; Weld new stainless steel holding down studs to the prepared bridge deck; Undertake Weld Test; Prime and waterproof bridge the deck with a high performance waterproofing system; Reinstate kerb units and fix down using new stainless steel fixings; Make good to all Drainage connections, with all of these aforementioned activities requiring strict associated Traffic Management control.

It is anticipated that the work may last for a duration of up to 12 months, from the proposed contract commencement date of 01/04/19.

Interested Contractors may access a copy of the trial documentation for information, via the Portal, as this is likely to be of assistance in helping them to determine if they can offer the same or a similarly durable and cost effective solution and encourage a tendered submission in due course.

However, no information taken or implied from this trial report and the supporting information documents shall necessarily be deemed acceptable for incorporation in the proposed works and the Council reserves the right to impose contractual terms and specifications that may not be satisfied by these means.

Key requirements

What the supplier must deliver

01

However, no information taken or implied from

However, no information taken or implied from this trial report and the supporting information documents shall necessarily be deemed acceptable for incorporation in the proposed works and the Council reserves the right to impose contractual terms and specifications that may not be satisfied by these means.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Cornwall Council, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
082b41f1-1658-4445-9ddc-085d9cdf08c0
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
CORNWALL001-DN291006-33196760
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

Cornwall Council’s tender network

Assembling the network…

Also open now

Similar open tenders

26-E-STAN07-FOC08-INTERFLEX-Wretham Camp-INTERFLEX Remediation (Work Package 9 - B CAMP Roof Winterisation)

Ministry of Defence

Closes 21 Aug 2026Construction
Value not publishedValue

26-E-STAN07-FOC08-INTERFLEX-Wretham Camp-INTERFLEX Remediation (Work Package 8 - A CAMP Roof Winterisation)

Ministry of Defence

Closes 21 Aug 2026Construction
Value not publishedValue