RFP QuestBeta
Awarded · ResultStage · contract

Blackpool & Fylde College

Blackpool and the Fylde College Replacement Flooring to University Centre Hub

Furniture & FurnishingsCPV 39000000 39500000
Value£28k
Awarded23 Jun 2015
Published4 Jun 2015
RegionNorth West
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£28ktotal contract value
median £101k
this tender£0£3.5m

This sits below the typical range for Furniture & Furnishings contracts — a smaller, more accessible award. Based on 5,729 valued Furniture & Furnishings tenders in our corpus.

The brief

NATURE OF THE WORK: Replacement of existing flooring to the UC Hub Building LOCATION: UC Hub Building, Blackpool and The Fylde College, Bennett Avenue, Blackpool, FY1 4EE Prepare the existing floor structure to the whole of the working area and provide and install Ardex Arditex NA latex screed to same and provide and install Forbo Surestep Stone non-slip flooring to manufactures instructions and to an approved colour.

Bond same in position and hot weld all joints.

Allow for sealing to all edges with silicon approved by flooring manufacturer and leave totally complete.

Contractor is to price for 2no. colours from the Forbe Surestep Stone range to principally match the existing two colour scheme, (colours to be agreed prior to ordering.) Note that the barrier matting is to remain as existing.

Carry out works to carefully break out and remove the plastic floor duct access covers and frames and clear debris from site.

Allow for making good all disturbed surfaces and leave ready for new duct cover specified elsewhere.

Carry out works to provide and install stainless steel cover and frame to each of the previously removed floor duct access covers.

Allow for installing 700 Series service outlet box in stainless steel without trim flange from Cableduct Limited or similar approved, complete with 3no. outlet flaps per cover in stainless steel (not plastic) and lock.

Each cover lid to be infilled with vinyl flooring as per flooring specification.

ITEM

Key requirements

What the supplier must deliver

01

Prepare the existing floor structure to

Prepare the existing floor structure to the whole of the working area and provide and install Ardex Arditex NA latex screed to same and provide and install Forbo Surestep Stone non-slip flooring to manufactures instructions and to an approved colour.

02

Carry out works to provide and install

Carry out works to provide and install stainless steel cover and frame to each of the previously removed floor duct access covers.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Blackpool & Fylde College, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
7d060592-bc7c-469d-98ec-c534913a41c6
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
Flooring to UC Hub
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Furniture & Furnishings

Scroll to explore the market network

Blackpool & Fylde College’s tender network

Assembling the network…

Also open now

Similar open tenders

Replacement Auditorium seating at The Point Theatre, Eastleigh

Eastleigh Borough Council

Closes 31 Jul 2026Construction
£100kValue

To Supply Leicester College with Cleaning Consumables

Leicester College

Closes 27 Jul 2026Furniture & Furnishings
£50kValue