RFP QuestBeta
Awarded · ResultStage · contract

Gloucestershire County Council

A46 Coopers Hill & Green Street, Gloucestershire - Ground Investigation

Engineering & ArchitectureCPV 71000000
Value£104k
Awarded29 Mar 2024
Published10 Jun 2024
RegionLondon
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£104ktotal contract value
median £95k
this tender£0£2.0m

This sits in the upper-middle of the Engineering & Architecture band — a substantial contract for the sector. Based on 33,646 valued Engineering & Architecture tenders in our corpus.

The brief

Gloucestershire County Council alongside their contractor AtkinsRéalis require a contractor to undertake a ground investigation to assess ongoing slope movement of Coopers Hill, which impacts two areas of the A46 carriageway and associated piled retaining wall, located near Brockworth.

The damage relates to ongoing regional slope movement that extends above and below the A46 carriageway.

A ground investigation is required to characterise the ground conditions under two sites.

The investigation will also install monitoring equipment to monitor ongoing ground movements and groundwater levels to identify the failure mechanism.\r \r The ground investigation will comprise an intrusive investigation to characterise the ground conditions.

Prior to intrusive works, it is imperative that the risk from buried services and overhead cables has been mitigated through, but not limited to, ascertaining the location of the services at the site, by use of cable avoidance equipment, risk assessments and any other means to mitigate potential risks.

This will then inform the locations of the intrusive holes.

The intrusive activities comprise:\r Eight (8 No.) boreholes commencing with dynamic sampling followed by rotary coring to between 20-50m bgl, including the following instrumentation;\r Three (3 No.) inclinometers to monitor ground movements;\r Four (4 No.) 50mm standpipes to monitor groundwater levels.\r \r Geotechnical sampling, in-situ and laboratory testing, and the production of a factual report, with associated AGS file, will be required. \r \r Surveying of grid coordinates and ground levels of each of the exploratory holes to Ordnance Survey grid and datum, including the corners of service inspection pits will be required.\r \r The works will be organised and managed by the Principal Contractor.

The Principal Contractor shall appoint a trained and competent person/organisation to undertake TM design and implementation throughout the works, a detailed TM plan for review shall be issued to the Principal Designer within one week of the preferred Principal Contractor being notified of contract award.

One week is required for review, and actions arising from the review will be communicated to the Contractor via the Principal Designer, it is expected that these actions (or agreed alternative action) will form part of the final TM plan.

If a detailed TM plan for review has not been provided within one week of the preferred Principal Contractor being notified of contract award, the Client reserves the right to appoint an alternative Principal Contractor. \r \r A single lane closure, operated under 2-way traffic signals, to be utilised for the works at the Green Street site and for access and storage for works below the Piled Retaining Wall.

The works are planned to take place between 7th May and 4th July 2024.\r \r It is anticipated that two rigs (2 No.) will be required to complete the work in the proposed timescale of 4 No. weeks with 2 No.

Engineers.

Key requirements

What the supplier must deliver

01

A ground investigation is required to characterise

A ground investigation is required to characterise the ground conditions under two sites.

02

The Principal Contractor shall appoint a trained

The Principal Contractor shall appoint a trained and competent person/organisation to undertake TM design and implementation throughout the works, a detailed TM plan for review shall be issued to the Principal Designer within one week of the preferred Principal Contractor being notified of contract award.

03

It is anticipated that two rigs (2

It is anticipated that two rigs (2 No.) will be required to complete the work in the proposed timescale of 4 No. weeks with 2 No.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Gloucestershire County Council, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
b3fc3c1a-f630-4078-8174-446becc5449f
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
GLOSCC001-DN710208-91352858
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Engineering & Architecture

Scroll to explore the market network

Gloucestershire County Council’s tender network

Assembling the network…

Also open now

Similar open tenders

School Streets PM (ESPO Framework Agreement (reference 664-25)

Bath and North East Somerset Council

Closes 17 Oct 2026Engineering & Architecture
Value not publishedValue

School Streets PM (ESPO Framework Agreement (reference 664-25)

Bath and North East Somerset Council

Closes 17 Oct 2026Engineering & Architecture
Value not publishedValue