Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
Temporary Accomodation - Cabins
This is a contract result notice, not an open opportunity. Details from the official award data.
This is a large award for Construction Materials & Structures — above three-quarters of comparable contracts. Based on 10,341 valued Construction Materials & Structures tenders in our corpus.
The Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3 will be establishing compounds and worksites across the trace.
Each of these locations will require infrastructure to support the workforce, ranging from the erection of suitable offices and meeting rooms for the Project Directors and the Client to operate from, through to temporary locations, established for interim periods or in a transient nature which the workforce can utilise during break times.
We will utilise semi permanent modular type buildings at each of it's compound locations.
These will vary in size, requiring office space and meeting rooms to support, at the smallest location, c25 workers to c300 at the largest.
Changing facilities and canteen area being required to support up to 200 workers changing simultaneously at peak.
The worksites will be more transient in nature, requiring welfare units to support smaller workforce numbers (between 8-32) during break times and briefings.
These transient units must be self sustaining as no mains connectivity will be available, and be robust enough to be moved by the vehicle fleet of Hookloaders and Craneloaders if required.
Units based on a standard 20ft ISO container, increasing to 30ft in extremis is acceptable.
A mixture of purchase and lease option will be explored.
Through this expression of interest you vetted in accordance with the Eiffage Kier prequalification model - for further information visit https://www.competefor.com/EiffageKier/ Upon successful shortlisting you will be invited to tender from the Eiffage Kier eSourcing platform Market Dojo Eiffage Kier will be using a balanced scorecard approach to its procurement activities - for further information visit the above website
What the supplier must deliver
These will vary in size, requiring office
These will vary in size, requiring office space and meeting rooms to support, at the smallest location, c25 workers to c300 at the largest.
Changing facilities and canteen area being required
Changing facilities and canteen area being required to support up to 200 workers changing simultaneously at peak.
The worksites will be more transient in
The worksites will be more transient in nature, requiring welfare units to support smaller workforce numbers (between 8-32) during break times and briefings.
These transient units must be self sustaining
These transient units must be self sustaining as no mains connectivity will be available, and be robust enough to be moved by the vehicle fleet of Hookloaders and Craneloaders if required.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- b973a46f-881a-4e33-b512-000d7e9ac172
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- C4A45241710
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction Materials & Structures
Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3’s tender network
Assembling the network…