Supply and Installation of Lecture Seating at Penryn Campus
This is a contract result notice, not an open opportunity. Details from the official award data.
This sits in the lower-middle of the Furniture & Furnishings band — a mid-scale opportunity. Based on 5,729 valued Furniture & Furnishings tenders in our corpus.
Supply and Installation of Lecture Seating at Penryn Campus The successful supplier shall enter into a contractual relationship with Falmouth Exeter Plus for the provision and installation of lecture theatre seating in the Daphne Du Maurier building (lecture theatres A and B) at the Penryn Campus, Penryn, Cornwall.
Specification: • Lecture theatre seating system for 300; • To be arranged as 9 rows of 0.95m (8.0m deep o.a.) with a 0.3m rise; • To be split into 1/3 and 2/3 banks (7.0m and 11.5m wide) with a central aisle for each; • All to be fully retractable (powered); • All to be fold down with continuous writing ledges; • All to be fully upholstered folding without arms (Seating Fabric – Fabric should be of a high quality and appropriate for high usage with minimal care and up-keep required (minimum 5 year life span under high usage conditions) Conforms to fire regulations BS5852 Crib 5.
Colours to be decided in conjunction with the client at a later stage– Full cleaning Instructions to be supplied with unit • Include all associated fixtures and finishes (e.g.
Fully carpeted decks with deck end trims) • Entire system to comply with Building Regulations, all relevant legislation and industry standards Optional: • Self-storing rails (sides only) for ease of operation and storage • Integral electric power operation with detachable controller for one man power operation
What the supplier must deliver
Supply and Installation of Lecture Seating at
Supply and Installation of Lecture Seating at Penryn Campus.
The successful supplier shall enter into
The successful supplier shall enter into a contractual relationship with Falmouth Exeter Plus for the provision and installation of lecture theatre seating in the Daphne Du Maurier building (lecture theatres A and B) at the Penryn Campus, Penryn, Cornwall.
Fabric should be of a high quality
Fabric should be of a high quality and appropriate for high usage with minimal care and up-keep required (minimum 5 year life span under high usage conditions) Conforms to fire regulations BS5852 Crib 5.
Entire system to comply with Building Regulations
Entire system to comply with Building Regulations, all relevant legislation and industry standards.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at FALMOUTH EXETER PLUS, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- ddff7e2f-e174-4f06-8fd1-d7b263a550cd
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- 825FXPLUS
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Furniture & Furnishings
FALMOUTH EXETER PLUS’s tender network
Assembling the network…
Similar open tenders
Design, Supply, and Installation of a Fully Refurbished Children’s Library Space within Newport Central Library
Newport City Council
Replacement Auditorium seating at The Point Theatre, Eastleigh
Eastleigh Borough Council