Removal and Installation of Dubh Artach Entrance Platform
This is a contract result notice, not an open opportunity. Details from the official award data.
The procurement contact named on the official notice.
NLB have a requirement for the removal and installation of the entrance platform at Dubh Artach lighthouse, situated off the west coast of Scotland, approximately 70 miles south-west of Oban, at a position of 56º 08.0’ North, 06º 37.9’ West.
The structure stands 38 meters high and is constructed from granite blocks.
The light is at an elevation of 44 metres, flashes 2 white every 30 seconds, and has a range of 20 miles.
The lighthouse tower is the only building on the rock outcrop.
The tower is accessed by a vertical ladder from the base of the tower to a steel platform 9.8m above.
The ladder is fitted with a fall arrest system that must be used when climbing the ladder.
The primary access to Dubh Artach Lighthouse is by helicopter, and landing at this light is only to be carried out on the ebb tide.
Due to the limited time window for helicopter operations the successful contractor will be required to stay on site, living within the lighthouse tower.
An NLB technician will be on site for the duration of the works to supervise and maintain a functioning light.
We are estimating 4 people in total staying at the lighthouse during the accessible periods outlined below, 3 maximum from the successful contractor and 1 NLB technician.
Our requirement is for the removal of the existing aluminium entrance platform at Dubh Artach, then installing the replacement entrance platform to completion, currently being manufactured by a third party to NLB drawings specifications.
Due to the location of this site, the majority of materials and equipment will be transported to and from site via NLB vessel & helicopter.
To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=967321745
What the supplier must deliver
The ladder is fitted with a fall
The ladder is fitted with a fall arrest system that must be used when climbing the ladder.
Due to the limited time window
Due to the limited time window for helicopter operations the successful contractor will be required to stay on site, living within the lighthouse tower.
An NLB technician will be on site
An NLB technician will be on site for the duration of the works to supervise and maintain a functioning light.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Northern Lighthouse Board, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- ocds-h6vhtk-04fc51
- Stage
- award · Awarded
- Source
- Find a Tender
- Buyer ref
- 041662-2025
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Northern Lighthouse Board’s tender network
Assembling the network…