NETWORK RAIL INFRASTRUCTURE LIMITED
Depots Package B – Doncaster West, Doncaster Belmont, Tyne Yard ES4-5
The procurement contact named on the official notice.
For suppliers that have qualified for this procurement via the RISQS EOI, all submissions must be provided via Bravo on itt_19772 & pqq_3954 . https://networkrail.bravosolution.co.uk/web/login.html
The submission route named on the official notice.
This sits in the lower-middle of the Engineering & Architecture band — a mid-scale opportunity. Based on 33,646 valued Engineering & Architecture tenders in our corpus.
The Depots and Stabling Project is the development of a strategy that is supported by necessary operational arrangements and any specific infrastructure interventions, to mitigate the impact that the railway access requirements of the wider TRU programme.
As an established site, Doncaster West, was identified as a favourable location that could be mobilised quickly to support an uplift to stable trains and provide a legacy.
An ES3 feasibility study is being developed which will be issued post contract award as the design is not mature enough at tender stage.
Draft design shall be issued for the tenderers to use to inform their tender offer.
TRU Engineering will provide engineering assurance.
In summary the key deliverables are the ES4 design development of the option selected in the Option Selection Report and the ES5 Detailed Design provision: • Validate that the option selected in the OSR is feasible, using the draft design for pricing purposes only, (considering all disciplines and operations and maintenance requirements) and provide a report and drawings to support the following scope as per the iCRD which include, but not limited to the following:- o Reinstate siding No 6 to stable a 9 car AZUMA trainset including all ancillaries and stand back. o Reinstate points No 5041 and confirm that no further works are required to other point ends to access the siding. o Points 5042 shall be clipped normal to prevent access to siding No 5.
This is to ensure adequate clearances are provided whilst the driver is performing their train inspection. o Provide 360-degree drivers walkway o Provide walkway lighting for the reinstated No 6 siding compliant to BS12464. o Provide a high level outline construction schedule. o Provide an assured ES 4-5 cost plan o PC appointed supplier to incorporate an ES6-8 Construction cost plan. o To explore opportunities in the programme to ensure EiS 4 months before December 2027. o Confirm that there or no OLE works required or define what works will be required to the OLE, including any earthing and bonding to meet the requirements of the i-CRD. o Confirmation that the existing method of working is valid for trains entering and leaving the depot and that the existing operational procedures will not need to be altered.
This will require engagement with the depot operator, local operations manager and will be facilitated by the NR POIS and project team.
The principal disciplines identified are Civil & Structural, Permanent Way, signalling (including ops and maintenance interface).
The contractor is responsible for identifying and undertaking any additional surveys they deem necessary acting as Principal Designer.
The design shall be deemed to include permanent and temporary works associated with all necessary railway disciplines.
All required designs, temporary works and disciplines are to comply with Network Rail Standards for submission and follow the prescribed engineering and construction methods to meet Network Rail Standards.
Engineering assurance, to validate the designs will follow those prescribed by NWR standards and TRU Engineering will be the assurance body for the design.
What the supplier must deliver
As an established site, Doncaster West, was
As an established site, Doncaster West, was identified as a favourable location that could be mobilised quickly to support an uplift to stable trains and provide a legacy.
Draft design shall be issued for
Draft design shall be issued for the tenderers to use to inform their tender offer.
TRU Engineering will provide engineering assurance
TRU Engineering will provide engineering assurance.
Validate that the option selected in
Validate that the option selected in the OSR is feasible, using the draft design for pricing purposes only, (considering all disciplines and operations and maintenance requirements) and provide a report and drawings to support the following scope as per the iCRD which include, but not limited to the following:-.
O Reinstate points No 5041 and confirm
o Reinstate points No 5041 and confirm that no further works are required to other point ends to access the siding.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at NETWORK RAIL INFRASTRUCTURE LIMITED, and generate a go-to-market strategy from their news, accounts and people.
The full intelligence dossier
Our agent reads NETWORK RAIL INFRASTRUCTURE LIMITED’s accounts, hunts live signals, finds the people who decide — and hands you a bid strategy plus a go-to-market influence plan, including what your team should post this week. You approve every paid step.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- ocds-h6vhtk-06cf34
- Stage
- tender · Open
- Source
- Find a Tender
- Buyer ref
- 068417-2026
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Engineering & Architecture
NETWORK RAIL INFRASTRUCTURE LIMITED’s tender network
Assembling the network…